挡墙桩基拔除与重建施工技术 被引量:2

Pile Foundation Removal and Retaining Structure Reconstruction
下载PDF
导出
摘要 文章以上海轨道交通11号线穿越桥台桩基为工程背景,通过综合比选确定了套管拔除+水压减摩的桩基拔除方案和"L"型挡墙+搅拌桩加固的挡墙重建方案;运用数值模拟软件对重建过程位移场的变化情况进行了计算复核。计算结果表明:"L"型挡墙结构能较好地抑制河道开挖过程中墙背土体的沉降,且结构自身变位小,能满足工程安全和周边环境保护的要求。研究成果可为今后类似工程提供借鉴和参考。 An existing abutment pile foundation is affected by the Shanghi metro line 11 and needs to be removed. Schemes of pile foundation removal with casing pipe and water pressure and retaining structure reconstruction with type L retaining structure and mixing pile were chosen. The computation of displacement during reconstruction was performed by numerical simulation software and the results indicate that the type L retaining structure can restrain the soil settlement at the back wall and there is little displacement of the retaining structure, meeting the requirements of engineering safety and environmental protection.
出处 《现代隧道技术》 EI 北大核心 2012年第5期155-159,共5页 Modern Tunnelling Technology
关键词 盾构穿越 桩基拔除 挡墙重建 有限元分析 Shield passing Removal of pile foundation Reconstruction of retaining structure FEM
  • 相关文献

参考文献5

二级参考文献17

  • 1杨晓杰,邓飞皇,聂雯,李桂刚.地铁隧道近距穿越施工对桩基承载力的影响研究[J].岩石力学与工程学报,2006,25(6):1290-1295. 被引量:105
  • 2Y. Iwasaki, H. Watanabe, M. Fukuda, A. Hirata & Y. Hori, Construction control for underpinning piles and their be - havior during excavation [ J ]. Geotechnique, 44(4), 1994, pp 681 -689.
  • 3I. Yamaguchi, I. Yamazaki, and Y. Kiritani, Study of ground - tunnel interactions of four shield tunnels drive in close proximity, in relation to design and construction of parallel tunnels [ J ]. Tunnelling and Underground Space Technology, Vol. 113, No. 3, pp. 289 - 304, 1998.
  • 4J.S. Sharma, A.M. Hefny, J. Zhao, C.W. Chan, Effect of large excavation on deformation of adjacent MRT tunnels [ J ]. Tunnelling and Underground Space Technology, 16 (2001) 913-98.
  • 5Kohichi Takahashi, Narutoshi Fukazawa, Toshiyuki agi- wara, Michitoshi Hosoda, Observational control of slurry shield tunnels with super close spacing under the nearby bridge abutments loads [ J ]. Tunnelling and Under- ground Space Technology, 19 (2004) 390.
  • 6Y. Iwasaki, H. Watanabe, M. Fukuda, A. Hirata & Y. Hori, Construction control for underpinning piles and their behavior during excavation [J]. Geotechnique, 44(4), 1994:681-689.
  • 7J.S. Sharma, A.M. Hefny, J. Zhao, C.W. Chan, Effect of large excavation on deformation of adjacent MRT tunnels [J]. Tunnelling and Underground Space Technology, 16 (2001):93- 98.
  • 8李永盛,黄海鹰.盾构推进对相邻桩体力学影响的实用计算方法[J].同济大学学报(自然科学版),1997,25(3):274-280. 被引量:58
  • 9邓飞皇.地铁隧道施工对近距桩基影响及桩基托换技术研究[硕士学位论文][D].北京:中国矿业大学,2004.
  • 10Forth R A,Thorley C B B.Hong Kong island line-predictions and performance[A].In:Mair R J,Taylor R N ed.Proceedings,Geotechnical Aspect of Underground Construction in Soft Ground[C].Rotterdam:A.A.Balkema,1996.677-682.

共引文献144

同被引文献10

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部