期刊文献+

考虑碳减排日指标约束的碳捕集调度策略 被引量:14

Dispatch Strategy for Carbon Capture Considering Day Index Constraints in Carbon Emission Reduction
下载PDF
导出
摘要 为了节能减排和碳捕集电厂不足情况下碳减排指标的完成,在碳减排日指标约束下,提出一种碳捕集调度策略以实现厂内减排和厂网协调减排。厂内减排引入碳捕集装置的启停次数,以煤耗最小为目标实现机组的组合。厂网协调减排时,通过多代理解决各时段的机组优化问题和机组爬坡问题,在综合考虑煤耗及网损的基础上,使碳捕集电厂多发电并进行碳捕集以实现CO2减排的目的。仿真结果表明,在不同指标的约束下,厂内减排和厂网协调减排能有效地实现碳减排任务。 To develop energy-saving and emission- reducing and achieve the carbon emission reduction target in the case of insufficient carbon capture plants, a dispatch strategy for carbon capture was proposed to realize carbon emission reduction of power plants and plant-grid coordination under carbon emission reduction day index constraints. In carbon emission reduction of power plants, the start-stop frequency of carbon capture device was considered and plant units were optimized to minimize coal consumption. In carbon emission reduction of plant-grid coordination, unit optimization of each period and creep speed of units was solved by multi-agent system. Based on an overall consideration of coal consumption and network loss, units bearing carbon-capture device was made to output more active power and their carbon was captured so as to achieve the objective of C02 capturing. The simulation results show that carbon emission reduction of power plants and plant-grid coordination can effectively realize the task of carbon emission reduction.
出处 《中国电机工程学报》 EI CSCD 北大核心 2012年第31期159-165,232,共7页 Proceedings of the CSEE
基金 国家自然科学基金项目(61071201)~~
关键词 节能减排 碳减排 碳捕集 多代理 机组爬坡 厂网协调 energy-saving and emission-reducing carbonemission reduction carbon capture multi-agent system unitcreep plant-grid coordination
  • 相关文献

参考文献22

二级参考文献211

共引文献838

同被引文献160

  • 1刘宇,曹江,朱声宝.挑战全球气候变化——二氧化碳捕集与封存[J].前沿科学,2010,4(1):40-51. 被引量:19
  • 2刘盛松,徐田,王敏.基于非线性原-对偶内点法的OPF算法及其校正策略[J].江苏电机工程,2005,24(6):31-34. 被引量:3
  • 3汪刚,冯霄.基于能量集成的CO_2减排量的确定[J].化工进展,2006,25(12):1467-1470. 被引量:63
  • 4魏一鸣,范英,等.中国能源报告(2008):碳排放研究[R].北京:科学出版社,2008:14-19.
  • 5Zhi-gang Lu, Tao Feng, Xue-ping Li.Low-carbon emis-sion/economic power dispatch using the multi-objective bacterial colony chemotaxis optimization algorithm con-sidering carbon capture power plant[J].Electrical Power and Energy Systems,2013,53:106-112.
  • 6Feron P, Abu-Zahra M, Alix P.Development of post-com-bustion capture of CO2 within the CASTOR integrated project:results from the pilot plant operation using MEA [C].The 3th International Conference on Clean Coal Tech-nologies for Our Future,Sardinia, Italy,2007.
  • 7Farina M, Amato P. A fuzzy definition of "optimality" for many-criteria optimization problem[J]. IEEE Transactions on System, Man and Cybernetics:Part A, 2004,34(3):315-326.
  • 8Zhen Ji, Chongqing Kang, Qixin Chen, et al. Prelimi-nary low-carbon power system dispatch incorporating carbon capture power plants[J].IEEE Transactions on Power Systems, 2013,4(28) :4615-4623.
  • 9Machteld van den Broek,Paul Veenendaal,Paul Koutstaal,Wim Turkenburg,André Faaij.Impact of international climate policies on CO 2 capture and storage deployment[J].Energy Policy.2011(4)
  • 10赖永生,刘明波.电力系统动态无功优化问题的快速解耦算法[J].中国电机工程学报,2008,28(7):32-39. 被引量:35

引证文献14

二级引证文献298

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部