Surface borehole synthesis tension deformation fracture time-space rule 被引量:5

Surface borehole synthesis tension deformation fracture time-space rule
下载PDF
导出
摘要 In order to release the tension and shear effect of the superjacent rock strata movement during excavation in coal mine,protect the surface borehole case from fracturing fast and make a good use of the surface borehole during goaf methane drawing,a common synthesis tension deformation fracture model was set up based on the synthesis tension effect of the rock strata,and the deformation rule of the surface borehole case with time and space was researched.The results suggest that,to reduce the deformation the surface borehole should be built between the boundary of the stope and the knee of subsidence curve.At the same time,a 3DEC simulation model and an engineering example were carried out to examine the rules of theoretical model.The result suggests that the model and the rules accord to the test and have good building and protection engineering application values to the surface borehole. In order to release the tension and shear effect of the superjacent rock strata movement during excavation in coal mine, protect the surface borehole case from fracturing fast and make a good use of the surface borehole during goaf methane drawing, a common synthesis tension deformation fracture model was set up based on the synthesis tension effect of the rock strata, and the deformation rule of the surface borehole case with time and space was researched. The results suggest that, to reduce the deformation the surface borehole should be built between the boundary of the stope and the knee of subsidence curve. At the same time, a 3DEC simulation model and an engineering example were carried out to examine the rules of theoretical model. The result suggests that the model and the rules accord to the test and have good building and protection engineering application values to the surface borehole.
出处 《International Journal of Mining Science and Technology》 2012年第4期465-470,共6页 矿业科学技术学报(英文版)
基金 supports for this work provided by the NationalScience and Technology Major Project (No. 2011ZX05040-004) the National Great Research Foundation of China (No.2011CB201203) the National Natural Science Foundation of China(No. 50904034)
关键词 Surface boreholeMethane drawingSynthesis tensionTime-space rules 地面钻孔 断裂时间 拉伸变形 合成 间规 断裂模型 岩层运动 工程实例