摘要
以山西兴能发电有限责任公司二期2×600 MW直接空冷机组为例,分析了凝结水精处理混床运行周期短、制水量少、树脂再生频繁的问题,从混床进水水质、再生剂纯度、给水加氨量及失效树脂的输送等方面查找原因,提出了相应的改进措施。实践证明,改进效果明显。
Some problems,such as the short operation cycle,the small amount of the prepared water,the frequent regeneration of the resin and others,existed in the mixed bed for condensed water fine treatment of the 2×600 MW direct air cooled unit of the Shanxi Xingneng Power Generation Company Limited project phase II.The reasons of the problems were found from several aspects,which include the quality of the mixed bed input water,the purity of the regenerating agent,the amount of the ammonia added into the feed water and the conveying of the exhausted resin.The improvement measures were proposed,and the practice shows that the effects of the measures are favorable.
出处
《华电技术》
CAS
2012年第10期52-54,79,共3页
HUADIAN TECHNOLOGY
关键词
凝结水
精处理
混床
制水量
运行周期
condensed water
fine treatment
mixed bed
amount of prepared water
operation cycle