摘要
本文介绍了地下大跨岩石隧洞于山溜冰场的施工步骤 ,微振动控制爆破技术在施工中的应用 ,以及树脂张拉锚杆的施工等技术。
This paper introduces the construction procedure of the Yushan skating rink which is an underground large span rock cavern under the Yushan Hill in Fuzhou City. The application of microseism controlled blasting technique during construction, as well as the construction technique of the resin tensile anchor bolts, are introduced also.
出处
《铁道工程学报》
EI
2000年第3期112-115,共4页
Journal of Railway Engineering Society
关键词
溜冰场
施工步骤
微振动控制爆破
树脂张拉锚杆
skating rink
construction procedure
microseism controlled blasting
resin tensile anchor bolt