摘要
通过对高寒地区客车供水系统“冻堵挂蜡”的惯性问题的分析 。
Via analysis of the customary problem of “freezing,plugging and like wax hanging” in the water supply system on passenger cars in the extremely cold area,it is put forward that application of the self controlled heating device and its electrical control system is an effective way to solve the problem.
出处
《铁道车辆》
2000年第6期19-21,共3页
Rolling Stock
关键词
铁路客车
供水系统
冻堵挂蜡
自调控伴热装置
passenger car
water supply
freezing and plugging
self controlled heating device