摘要
从变换的目的出发,论述了变换反应的段数选择,从热量平衡角度论述了饱和热水塔与系统耗能的关系,并介绍变换工艺流程的选择原则。
From purpose of syngas shift process, to elaborate stages selecting for syngas shift reaction. From the perspective of the heat balance, to describe the relationship between saturated hot water tower and system energy consumption, and to introduce syngas shift process selection principle.
出处
《化工设计通讯》
CAS
2012年第5期27-29,共3页
Chemical Engineering Design Communications
关键词
变换
设置
工艺
催化剂
.饱和热水塔
shift
install
process
catalyst
saturated hot water tower