高速公路交通工程设施预留预埋通常随公路主体工程同步施工,而交通工程设备安装及线缆敷设等施工项目在时间上相对滞后,文章结合高速公路实际建设情况,对交通工程设施预留预埋施工存在的问题及原因进行了分析,并从从高速公路建设管理角度对设计、施工、监理等环节提出相应建议。
Pre-reserving and pre-burying of highway traffic engineering facilities usually constructed synchronously with the highway main body engineering, however, the traffic engineering equipment installation and cable laying construction project are relatively lag behind. Combined with the actual construction of highway, problems existing in traffic engineering facilities pre-reserving and pre-burying construction and their reasons were analyzed, and from angle of highway construction management corresponding proposals on design, construction and supervision etc. were put forward.