武广高速铁路金沙洲隧道是我国首次在复杂地质条件下下穿城市立交桥的浅埋特大断面(大于160m2)隧道。为了确保施工过程安全可控,对沙贝立交枢纽进行风险辨识和风险评估,根据评估结果,在洞内外采取了有效的降低施工风险的处理措施,确保了浅埋特大断面隧道下穿立交枢纽的安全,可供类似工程参考。
Jinshazhou tunnel at Wuhan-Guangzhou High-speed railway is China's first shallow tunnel with large section(greater than 160 m2) under complicated geological conditions beneath urban overpass.In order to ensure safe and controlled work in construction process,the risk assessment and the risk identification of the Shabei interchange hub were studied.According to the results of the assessment,effective measures were taken to reduce construction risk in the cave.The security of the interchange hub beneath the shallow tunnel with large section is ensured.This paper could be as a reference to the similar projects.
出处
《地下空间与工程学报》
CSCD
北大核心
2012年第A02期1805-1808,1817,共5页
Chinese Journal of Underground Space and Engineering
关键词
高速铁路
浅埋特大断面隧道
立交桥枢纽
风险评估
风险控制
high-speed railway
shallow large section tunnel
interchange hub
risk assessment
risk control