摘要
对大型立式储罐整体移动吊装方案进行了分析,通过受力图,列出强度计算公式,提出了解决问题的两种方案,并进行了实例计算,同时指出两种方案的优缺点。另外,对现场吊装中容易产生的问题及注意事项作了说明。
This paper analyzes the integral moving plan for large-scale vertical tank.It lists the strength calculation formula according to the force diagram.The paper presents two plans to solve the problems and carries out example calculation.It also points out the merits and demerits of the two plans.In addition,the paper illustrates the problems that easily appear in hoisting at site and points for attention.
出处
《石油化工设备技术》
CAS
2012年第5期9-10,69,共2页
Petrochemical Equipment Technology
关键词
立式储罐
吊装
应力
Vertical Tank
Hoisting
Stress