为缩短设计周期和建设周期,提高设计效率,加快工程建设速度,普光气田集输设备采用橇装化、标准化设计。集输设备橇装化、标准化不仅能优化设计,还能实现提前预制、提前采购,达到缩短气田的建设周期,现场吊装方便、操作集中,占地少。不过普光气田集输橇装设备在规格书、采购、图纸审查、到货验收、及现场安装调试过程中也暴露一些设计、采购及现场组装调试的不足,本文就结合普光气田集输橇装化设备在应用中的优缺点及暴露的问题进行分析,并提出改进措施,在以后的气田集输及其他工程中加以改进。
In order to shorten the design cycle and building cycle,improve design efficiency,speed up projects,skid-mounted and standandized dusign.is applied in the puguang gas field collection and transmission project to expedite the project,alleviate fatigue,increases engineering quality,lower the engineering cost.But there are some shortange in design,shopping,installation and debugging.Combines with the advantages and,disadvantages exposed in application,problems were analysised and some suggestions of improvements were given.