摘要
水电站机电及金属结构等设备采购费用占水电站工程项目总投资的比重较大。通过合理、科学的计划和分标,严格按照招投标法律法规的规定,坚持"公开、公平、公正、诚实信用"的原则,选择适用于工程、性价比高的水电站设备,是水电站建成投产后经济、安全、持续运行的重要基础。
The procurement costs for electro-mechanical equipments and metal structures account for a great proportion of total investment in hydropower projects.The selection of suitable and cost-effective hydropower equipment is an important basis for economic,safe and sustainable operation of hydropower station,which can be realized by rational and scientific planning and sub-bids based on strictly following the provisions of Laws and Regulations on Bidding and Bid and on insisting the principles of "openness,fairness,justice,honesty and credibility".