介绍了施工阶段围岩分类法在橙子沟水电站的试用情况及成果,将其成果与现行分类法结果作以对比,阐述了对施工阶段围岩分类法的修正以及在橙子沟水电站试用的效益。
Trial application of surrounding rock classification at construction stage of Chengzigou Hydropower Project is introduced. Resuits by both surrounding rock classification and existing classification being applied currently are compared. Amendment of surrounding rock classification at construction stage and benefits from trial application of surrounding rock classification of Chengzigou Hydropower Project are described.
出处
《西北水电》
2012年第5期17-22,共6页
Northwest Hydropower
关键词
围岩分类法
隧洞施工
工程地质
橙子沟水电站
Surrounding Rock Classification
tunneling construction
engineering geology
Chengzigou Hydropower Project