结合潘口水电站的室内及现场碾压试验成果,确定了坝体填筑参数。针对现场料源情况,对垫层料采用平铺立采工艺,掺混效果良好。在施工质量控制方面引入了承载板法,取得了良好的效果。
Parameters for embankment fill of Pankou Hydropower Project are determined in accordance with test results from compaction performed indoor and site. Based on embankment material sources at site, materials for bedding cushion is exploited vertically and laid horizontally. Application of mixture achieves good effect. The bearing plate method is applied in term of construction quality control and the expected results are achieved.
出处
《西北水电》
2012年第5期48-53,共6页
Northwest Hydropower
关键词
面板堆石坝
坝体填筑
施工
质量控制
Concrete face rockfill dam
embankment fill
construction
quality control