潘口水电站面板堆石坝坝体填筑施工质量控制 被引量:1

Quality Control of Embankment Fill Construction of Concrete Face Rockfill Dam,Pankou Hydropower Project
下载PDF
导出
摘要 结合潘口水电站的室内及现场碾压试验成果,确定了坝体填筑参数。针对现场料源情况,对垫层料采用平铺立采工艺,掺混效果良好。在施工质量控制方面引入了承载板法,取得了良好的效果。 Parameters for embankment fill of Pankou Hydropower Project are determined in accordance with test results from compaction performed indoor and site. Based on embankment material sources at site, materials for bedding cushion is exploited vertically and laid horizontally. Application of mixture achieves good effect. The bearing plate method is applied in term of construction quality control and the expected results are achieved.
出处 《西北水电》 2012年第5期48-53,共6页 Northwest Hydropower
关键词 面板堆石坝 坝体填筑 施工 质量控制 Concrete face rockfill dam embankment fill construction quality control
  • 相关文献

参考文献3

  • 1李宜民.理论力学[M]徐州:中国矿业大学出版社,1996.
  • 2成大先.机械设计手册[M]北京:化学工业出版社,2008.
  • 3杨泗霖.焊接安全[M]北京:中国劳动社会保障出版社,2006.

同被引文献2

  • 1DL/5129-2001碾压式土石坝施工规范[S].北京:中国电力出版社,2001.
  • 2DL/T5355-2006,水电水利工程土工试验规程[s].北京:中国电力出版社,2007.

引证文献1

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部