4KARWOWSKI. Applications of approximate reasoning in risk analysis [ C ]//Applications of Fuzzy Set Theory in Human Factors. New York : Elsevier, 1986.
3SHANNON C E, The mathematical theory of communication [ J ]. Bell System Technical Journal, 1948,27:379-423.
4TAH J H M, CARR V. A Proposal for Construction Project Risk Assessment Using Fuzzy Logic [ J ]. Construction Management and Economics ,2000,18 ( 4 ) :491-500.
5Barlow,Paul M,Harbaugh,AW,et al.USGS directions in MODFLOW development. Ground Water . 2006
4EINSTEIN H H. Risk and risk analysis in rock engineering[J].{H}Tunnelling and Underground Space Technology,1996,(02):141-155.
5ESKESEN S D,TENGBORG P,KAMPMANN J. Guidelines for tunneling risk management:international tunneling association,working group No.2[J].{H}Tunnelling and Underground Space Technology,2004,(03):217-237.
6崇明.越江通道工程风险分析研究总报告[R]{H}上海:同济大学,2002.
7SAATY T L. Fundamentals of the analytic hierarchy process[M].Pittsburgh:RWS Publications,2000.