摘要
介绍了一起低压五芯电力电缆的质量纠纷,通过剖析低压五芯电力电缆的结构缺陷,从电缆结构和安装方式不同角度对事故发生的原因进行了阐述,并对低压五芯电力电缆的结构尺寸重新进行了工艺计算,提出了改善建议。
A quality dispute of low voltage five cores power cable is introduced.The reason of dispute was analyzed from two aspects containing structure size and arrangement mode.The process planning of the five cores is designed again which is different from the former.The new design is more compacter which can improve the safety and reliability of the cable.
出处
《电线电缆》
2012年第5期13-15,共3页
Wire & Cable
关键词
低压五芯电力电缆
结构缺陷
安装方式
工艺计算
low voltage five cores power cable
reason analyze
suggestion
process calculation