摘要
着眼于列调车作业次序控制问题,在深入分析中间站接发车作业和摘挂作业关系的基础上,提出关于列调车作业序列化控制的一个优化方案,同时给出优化方案中涉及的一些关键问题的处理机制。
The paper aims at the issue of the sequences of trains and shunting operation. Based on the in- depth analysis of the operating relation between the reception and departure of trains and coupling and decoupling of cars, it puts forward an optimization scheme to the sequence of train and shunting operation, and presents the mechanism for some key issues involved in the scheme at the same time.
出处
《铁路通信信号工程技术》
2012年第5期3-5,共3页
Railway Signalling & Communication Engineering
关键词
调度集中
中间站
列调车作业次序
centralized traffic control
intermediate station
operating sequence of trains and shunting