3条进线3台变压器的110kV变电站主接线方式选择 被引量:11

Selection of Main Connection Methods for a 110kV Substation with Three Incoming lines and Three Transformers
下载PDF
导出
摘要 国家电网公司"两型一化"变电站建设设计导则,对110kV终端变电站主接线方式提出了具体的要求。以一座典型3条进线3台主变压器的110kV变电站主接线方式的选择为例,通过分析国家电网公司通用变电站设计中的几种典型主接线方式的特点,对该典型110kV变电站主接线方式进行初步选择。经过方案比较,确定了适合3条进线3台主变压器的110kV变电站的主接线方式。 According to substation requirement are raised to the 110 construction guidance "two type one model" by kV terminal substation main connection methods. State Grid, specific A typical 110 kV substation with 3 incoming lines and three transformers set as an example, features of several classical main connection methods for designing of common substation within State Grid are analyzed and basic selection of the 110 kV substation main connections is settled. After comparing, a suitable main connection method is decided for the 110 kV substation with 3 incoming lines and three transformers.
作者 黄华生
出处 《供用电》 2012年第5期42-45,共4页 Distribution & Utilization
关键词 110KV变电站 主接线方式 内桥接线 线路-变压器组接线 110kV substation main connection method internal bridge connection line-transformergroup connection
  • 相关文献

参考文献4

二级参考文献6

  • 1刘柏私,谢开贵,张红云,周彦佩.高压配电网典型接线方式的可靠性分析[J].电网技术,2005,29(14):45-48. 被引量:23
  • 2[2]水利电力部西北电力设计院.电力工程电气设计手册电气一次部分[M].北京:中国电力出版社,2005.
  • 3王士政.发电厂电气部分(第三版)[M].北京:中国水利水电出版社,2004.
  • 4能源电[1993]第228号《城市电力网规划设计导则》(试行)[M].北京:中国电力出版社,1983.
  • 5Wang P,Billinton R.Reliability cost/worth assessment of distribution system incorporating time-varying weather conditions and restoration resources[J].IEEE Trans on Power Delivery,2002,1(17):260-265.
  • 6国家电网公司生产运营部.《编制"城市高压配电网‘十一五’规划报告"的指导意见》[M].北京:中国电力出版社,2003.

共引文献17

同被引文献66

引证文献11

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部