基于PRO/E的三峡升船机埋件安装工艺与干涉分析应用

Installation Process of the Embedded Parts and Interference Analysis Application of Three Gorges Ship Lift Based on PRO/E
下载PDF
导出
摘要 三峡升船机二期埋件安装精度高,与土建混凝土结构关系紧密,埋件安装就位十分困难。安装方案研究阶段,采用pro/e软件,对齿条及螺母柱二期埋件等关键金属结构的安装进行了分析,以提供指导性意见。 The high precision in the second period embedded parts installation of Three Gorge lift-ship is high, and it has close relationship with civil engineering concrete structures, so installation in place is very difficult. In the research phase of the installation programme, they used the Pro/e software to analyze the installation of the key metal structure, such as, rack, nut column second embedded parts, and so on, so as to provide guided idea.
作者 杨红 魏艳
出处 《价值工程》 2012年第31期71-72,共2页 Value Engineering
关键词 PRO E 三峡升船机 埋件安装 干涉分析 PRO/E Three Gorges ship lift embedded parts installation interference analysis
  • 相关文献

参考文献3

二级参考文献3

  • 1交通部.航道技术政策[S].
  • 2交通部水运工程科技情报网.通航升船机[G].北京:中交水运规划设计院,1990.
  • 3交通部《航道技术政策》编写组.航道技术政策研究成果汇编[G].北京:中国水利学会港口航道专业委员会,1987.

共引文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部