大盈江水电站蜗壳吊装施工技术研究

The Volute Lifting Construction Technology of Yingjiang Hydropower Station
下载PDF
导出
摘要 在水电站施工当中,特别是在前期机电埋件施工时,厂房桥机没有形成,土建施工为节约投入成本,不愿过多和过早投入起吊设备,甚至不投入起吊设备,钢筋预制件采用农民工扛到仓号,混凝土入仓利用地形高差采用溜槽入仓,造成机电埋件运输就位困难,大吨位埋件无法施工,被迫修改施工措施。 In the construction of hydropower station, especially in the early embedded parts construction, building bridge machine was not formed. In order to save costs, they are not willing to input excessive and premature lifting equipment in civil construction, even do not input, ask the migrant workers to lift the reinforced precast to the warehouse number, use the concrete chute warehousing according to the topographic height difference, so the electrical embedded parts transport is difficult to emplace, large-tonnage embedded parts cannot be constructed, so we must modify theconstruction measures.
出处 《价值工程》 2012年第31期114-115,共2页 Value Engineering
关键词 大盈江水电站 施工技术 Yingjiang hydropower station construction technology
  • 相关文献

参考文献3

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部