通过对龙潭湾大桥空心高墩滑模施工技术模板、混凝土、提升设备等的研究和实践,有效地解决了空心高墩在施工过程中施工冷缝频繁出现、进度缓慢、安全风险大、过程控制难等施工难题,既保证了施工质量、缩短了工期,也节省了施工费用降低工程成本。
Longtan Wan Bridge by slip-form construction technology of hollow high pier formwork, concrete, lifting equipment, such as research and practice, effectively solve the cold joints of hollow high pier construction in the construction process appears frequently, slow progress, construction challenges such as security risks, process control, ensure the construction quality, shorten the duration, saves construction costs also lower engineering costs.