摘要
针对摩托车包装作业线上各工序之间不均衡且存在大量等待时间的现象,以动作经济原则和"ECRS"四大原则为指导,结合生产线平衡理论,运用模特法对包装线上的瓶颈工序进行了分析,根据分析结果设计了相应的改善方案。方案的实施使生产线平衡率提高了22.2%,生产节拍降低了5.43 s。
A lot of idle and waiting time exists among some workstations in motorcycle packaging line. Aiming at this phenomenon, the bottle-neck section of packaging line was studied using MOD method. According to the principle of motion economy, the principles of ECRS and the theory of assembly line balance, a new scheme was put forward. Im- plementation of this new scheme makes the rate of production line balance upgrade 22.2% and the cycle time decrease 5.43 seconds.
出处
《包装工程》
CAS
CSCD
北大核心
2012年第21期137-141,共5页
Packaging Engineering
基金
广东省湛江市科技攻关计划项目(2011C3108002)