摘要
介绍了6000 Nm3/h空分设备改造前后的流程和设计参数。阐述了本次空分设备改造的流程设计要点与设计过程中遇到的难点处理;在空分设备设计、工程设计、安装、调试中出现的问题及解决方法;利旧设备的检测方法等。
This article introduces the process and design parameters before and after the reform for 6000 Nm3/h air separa- tion plant. It explains the main points and the difficulties during the process design, problems and solutions in ASP design, engineering design, erection and commissioning; detection of old plant and so on.
出处
《低温与特气》
CAS
2012年第5期17-21,共5页
Low Temperature and Specialty Gases
关键词
空分设备
改造设计
利旧设备检测
安装调试
结果
air separation plant
reform design
detection of old plant
erection and commissioning
result