Vehicle OHT Dispatching Performance Analysis of an AM HS in 300 mm Semiconductor FABs 被引量:2

Vehicle OHT Dispatching Performance Analysis of an AMHS in 300 mm Semiconductor FABs
下载PDF
导出
摘要 To improve the performance of an automated material handling system (AMHS) in 300 mm semiconductor fabrication plants (FABs), an overhead-hoist-transport (OHT) vehicle dispatching problem was described for semiconductor FABs. An original wafer lot dispatching policy was proposed. To minimize costs due to transportation logic, a dispatching rule based on an adapted Hungarian algorithm was presented, and six factors were considered. In addition to the recurring parameters, two original parameters of the vehicles utilization and wafer lot priority were considered to evaluate system performance. To obtain a balanced efficiency regarding the FAB output factors, simulation and sensitive analysis were used to find the best weight parameters of the cost matrix. In particular, a high rate of priority wafer lots (greater than 20%) and vehicles utilization (greater than 75%) are obtained without penalizing the efficiency of the FABs. The results indicate that the proposed dispatching policy is valid and practical. To improve the performance of an automated material handling system (AMHS) in 300 mm semiconductor fabrication plants ( FABs ), an overhead-hoist-transport ( OHT ) vehicle dispatching problem was described for semiconductor FABs. An original wafer lot dispatching policy was proposed. To minimize costs due to transportation logic, a dispatching rule based on an adapted Hungarian algorithm was presented, and six factors were considered. In addition to the recurring parameters, two original parameters of the vehicles utilization and wafer lot priority were considered to evaluate system performance. To obtain a balanced efficiency regarding the FAB output factors, simulation and sensitive analysis were used to find the best weight parameters of the cost matrix. In particular, a high rate of priority wafer lots ( greater than 20 % ) and vehicles utilization ( greater than 75 % ) are obtained without penalizing the efficiency of the FABs. The results indicate that the proposed dispatching policy is valid and practical.
出处 《Journal of Donghua University(English Edition)》 EI CAS 2012年第3期209-214,共6页 东华大学学报(英文版)
基金 National Natural Science Foundations of China ( No. 71071115,No. 61273035) National High-Tech R&D Program for CIMS,China ( No. 2009AA043000)
关键词 overhead-hoist-transport (OHT) HUNGARIAN algorithm cost matrix DISPATCHING RULE overhead-hoist-transport (OHT) Hungarian algorithm cost matrix disoatching rule
  • 相关文献

参考文献18

  • 1Johri P K. Practical Issues in Scheduling and Dispatching in Semiconductor Wafer Fabrication [ J ]. Journal of Manufacturing Systems, 1993, 12(6): 474-485.
  • 2Agrawal G K, Heragu S S. A Survey of Automated Material Handling Systems in 300-mm Semiconductor Fabs [J]. IEEE Transactions on Semiconductor Manufacturing, 2006, 19 ( 1 ) : 112-120.
  • 3Egbelu P J, Tanchoco J M A. Characterization of Automatic Guided Vehicle Dispatching Rules [ J ]. International Journal of Production Research, 1984, 22 (3) : 359-374.
  • 4Bartholdi J J, Platzman L K. Decentralized Control of Automated Guided Vehicles on a Simple Loop[J]. IIE Transactions, 1989, 21(1) : 76-81.
  • 5Liao D Y, Wang C N. Differentiated Preemptive Dispatching for Automatic Materials Handling Services in 300 mm Semiconductor Foundry [ J ]. The International Journal of Advanced Manufacturing Technology, 2006, 29(9/10) : 890-896.
  • 6Koo P H, Jang J, Suh J. Vehicle Dispatching for Highly Loaded Semiconductor Production Considering Bottleneck Machines First [ J ]. International Journal of Flexible Manufacturing Systems, 2005, 17(1) : 23-38.
  • 7Vis I F A. Survey of Research in the Design and Control of Automated Guided Vehicle Systems [ J ]. European Journal of Operational Research, 2006, 170(3 ): 677-709.
  • 8Liao D Y, Fu H S. Dynamic OHT Allocation and Dispatching in Large-Scale, 300-mm AMHS Management [J]. IEEE Robotics & Automation Magazine, 2004, 11 (3) : 22-32.
  • 9Kim B I, Shin J, Jeong S, et al. Effective Overhead Hoist Transport Dispatching Based on the Hungarian Algorithm for a Large Semiconductor FAB [ J ]. International Journal of Production Research, 2009, 47( 10): 2823-2834.
  • 10Wu L H, Mok P Y, Zhang J. An Adaptive Multi-parameter Based Dispatching Strategy for Single-Loop Interbay Material Handling Systems [ J ]. Computers in Industry, 2011, 62 ( 2 ) : 175-186.

同被引文献22

  • 1Qu P,Mason S J.Using Tabu Search on the Single Machine Multi-orders per Job Scheduling Problem[C].IIE Annual Conference and Exhibition 2004,Houston,USA,2004:1831-1835.
  • 2Sobeyko O,Monch L.Genetic Algorithms to Solve a Single Machine Multiple Orders per Job Scheduling Problem[C].Proceedings of the Winter Simulation Conference,Piscataway,USA,2010:2493-2503.
  • 3Mason S J,Chen J S.Scheduling Multiple Orders per Job in a Single Machine to Minimize Total Completion Time[J].European Journal of Operational Research,2010,207(1):70-77.
  • 4Laub J D,Fowler J W,Keha A B.Minimizing Make span with Multiple-Orders-per-Job in a Two-Machine Flowshop[J].European Journal of Operational Research,2007,182 (1):63-79.
  • 5Jampani J,Mason S J.Column Generation Heuristics for Multiple Machine,Multiple Orders per Job Scheduling Problems[J].Annals of Operations Research,2008,159 (1):261-273.
  • 6Jia J,Mason S J.Semiconductor Manufacturing Scheduling of Jobs Containing Multiple Orders on Identical Parallel Machines[J].International Journal of Production Research,2009,47(10):2565-2585.
  • 7Yang S J.Unrelated Parallel-Machine Scheduling with Deterioration Effects and Deteriorating Multi-maintenance Activities for Minimizing the Total Completion Time[J].Applied Mathematical Modelling,2013,37(5):2995-3005.
  • 8Chen J S.Optimization Models for the Flow-Shop Scheduling Problem with Multiple Orders per Job[C].2010 40th International Conference on Computers and Industrial Engineering,Piscataway,USA,2010:1-6.
  • 9Zhou B H,Zhai Z Q.Lifetime Distribution Model of Port Facilities with Pitting Corrosion of Stochastic Processes[C].2010 International Conference on Frontiers of Manufacturing and Design Science,Chongqing,China,2011:46-50.
  • 10Li Y P,Liu Y.Research on Vehicle Routing Problem Based on Immune Genetic Algorithm[C].2010 2rid International Conference on Information Engineering and Computer Science,Wuhan,China,2010:1-4.

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部