摘要
本文通过某电厂680MW超临界锅炉分隔屏过热器两次壁温突升的原因分析,提出相应的解决措施,并提出预防措施。
In this paper,through a 680MW supercritical boiler division Panel Superheater wall tem- perature at two times the cause analysis, put forward corresponding settlement measures, and puts for- ward the prevention measures.
出处
《锅炉制造》
2012年第6期21-22,共2页
Boiler Manufacturing
关键词
超超临界
超温
处理措施
ultra supercritical
over temperature
treatment measures