摘要
介绍了水轮发电机组定子绕组接地的几种查找方法。论述了如何利用生产现场一些常用试验器材来快速确定定子绕组接地部位。
An introduction was made on several methods for tracking turbine generator stator winding earthing posi- tions, based on which the authors present how to quickly find the stator winding earthing positions with test devices in common use.
出处
《广西水利水电》
2012年第5期62-63,共2页
Guangxi Water Resources & Hydropower Engineering
关键词
发电机
定子绕组
多分支
接地
Generator
stator winding
multi-circuit
earthing