摘要
以某斜拉桥主塔拼装施工为例,对圆环钢塔节段吊装与支护进行了详细论述,并对各工艺进行了系统分析,为类似工程的大型吊装及钢结构施工提供了借鉴。
Taking the assembly construction of a cable-stayed bridge main tower as an example, the paper discussed in detail to segment hoisting and supporting of ring steel tower, and made system analysis on each process, provided reference for similar projects grant hoisting and steel structure construction.