摘要
金沙江中游水电开发移民搬迁安置工作过程中,推广实施"16118移民补偿安置方式"以来,取得了巨大的成功,有力地推动了云南水电工程建设。但在具体实践操作过程中,由于各种原因也碰到了一些难点问题。分析表明这些问题一方面是对此政策理解释的不一致造成的,另一方面是政策本身仍有需要完善的地方。
The "16118" Compensatory Resettlement Mode is applied in the resettlement of hydropower development in the middle reaches of Jinsha River. The implementation of "16118" pehcy has achieved great success and promotes the development of hydropower in Yunnan Province, but some problems are also encountered in practice. The study shows that these problems are caused by the inconsistent understanding on the policy on one hand, and on the other hand, the policy itself is still need to be improved.
出处
《水力发电》
北大核心
2012年第11期13-15,共3页
Water Power
关键词
移民安置方式
成效
问题
对策
云南
resettlement mode
effectiveness
problem
countermeasures
Yunnan