阿海水电站坝基固结灌浆施工组织及质量控制 被引量:5

Construction Organization and Quality Control on Consolidation Grouting of Dam Foundation in Ahai Hydropower Station
下载PDF
导出
摘要 阿海水电站采用有盖重基础固结灌浆施工,灌浆孔全坝基布设,与混凝土浇筑施工的工期相互影响较大。介绍了阿海水电站基础固结灌浆的施工组织及质量控制工作,综合分析坝基固结灌浆施工特性及难点。通过加强灌浆过程控制,工程质量和进度得以有效保证。 The dam foundation consolidation grouting in Ahai Hydropower Station is conducted with cover-weight, and the grouting holes are arranged in full foundation. The consolidation grouting is interfered with the pouring of dam concrete. The construction organization and quality control of consolidation grouting in Ahai Hydropower Station are introduced herein and the characteristics and difficulties of consolidation grouting are comprehensively analyzed. The quality and progress of consolidation grouting are effectively guaranteed by strengthening grouting process control.
出处 《水力发电》 北大核心 2012年第11期59-61,74,共4页 Water Power
关键词 固结灌浆 施工组织 质量控制 阿海水电站 consolidation grouting construction organization quality control Ahai Hydropower Station
  • 相关文献

参考文献1

二级参考文献4

  • 1巾围水电顾问集团中南勘测设计研究院.龙滩水电站可行性研究补充设计报告[R].长沙:中国水电顾问集团中南勘测设计研究院.2002.
  • 2孙钊.大坝基岩灌浆[M].北京:中国水利水电出版社,2006.
  • 3DL/T5148-2001.水工建筑物水泥灌浆施工技术规范[S].[S].,..
  • 4DL/T5108-1999 混凝土重力坝设计规范[S].

共引文献1

同被引文献14

引证文献5

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部