期刊文献+

飞机计划恢复的混合集合规划方法研究 被引量:5

Research on Mixed Set Programming for Aircraft Schedule Recovery
下载PDF
导出
摘要 恶劣天气和机械故障等原因造成航班不能正常运行,航空公司需要重新安排飞机路线和受扰航班的起降时间.不正常航班的飞机计划恢复问题是一个典型的NP-Hard问题,为解决这一问题,采用混合集合规划方法,引进更一般的约束条件,建立了自然约束语言模型,设计简洁且高效的求解策略,实现了多机型的飞机计划恢复.最后对各种规模的实例进行了测试,并与贪婪模拟退火算法进行比较,表明了这种方法在求解质量和时间效率上的优越性. Imclement weather, mechanical failures often prevent airlines from executing their schedules as planned, and will bring about a lot of losses to airlines and passengers. To recover the schedule, the decision makers must reroute the aircrafts and re-time the disturbed flights. Aircraft Schedule Recovery problem is a typical NP-Hard problem in Irregular Flight Operation. This paper proposes a mixed set programming method to solve the problem by building a natural constraint language model and designing efficient search rules. Finally, instances of different scales are tested respectively using the mixed set programming and greedy simulated annealing algorithm, which shows the superiority of mixed set programming method in solution quality and time efficient over greedy annealing algorithm.
作者 朱博 朱金福
出处 《小型微型计算机系统》 CSCD 北大核心 2012年第11期2556-2560,共5页 Journal of Chinese Computer Systems
基金 国家自然科学基金项目(61079014)资助 民航软科学基金项目(MHRD201053)资助
关键词 不正常航班 飞机计划恢复 混合集合规划 自然约束语言 贪婪模拟退火 ilrregular flight aircraft schedule recovery mixed set programming natural constraint language greedy simulated annealing
  • 相关文献

参考文献2

二级参考文献18

  • 1Etschmaier M M, Mathaisei D F X. Airline scheduling: an overview [ J ]. Transportation Science, 1985, (2) : 127-138.
  • 2Teodorovic D, Guberinic S. Optimal dispatching strategy on an airline network after a schedule perturbation [ J ]. European Journal of Operational Research, 1984, (15) : 178-182.
  • 3Teodorovic D. Airline operations research [ M ]. New York: Gordon and Breach Science Publishers, 1988. 256-300.
  • 4Cao J, Kanafani A. Real-time decision support for integration of airline flight cancellations and delays, part I: mathematical formulations [J].Transportation Planning and Technology, 1997, (20): 183-199.
  • 5Teodorovic D, Stojkovic G. Model to reduced airline schedule disturbances[ J]. Journal of Transportation Engineering, 1995, (4): 324-331.
  • 6Thengvall B G. Models and solution techniques for the aircraft schedule recovery problem [ D ]. Austin: The University of Texas, 1999.
  • 7Yan S, Young H. A decision support framework for multi-fleet routing and muhi-stop flight scheduling [ J ]. Transportation Research, Part A: Policy and Planning, 1996, (30) : 379-398.
  • 8Yan S, Tu Y. Multi-fleet routing and multi-stop flight scheduling for schedule perturbation[ J]. European Journal of Operational Research, 1997, (103) : 155-169.
  • 9Michael F A, Jonathan F B. A grasp for aircraft routing in response to grounding and delays [ J ]. Journal of Combinatorial Optimization, 1997, (5) : 211-228.
  • 10Apurva Mathur, John-Paul Clarke. How healthy is your operation, AGIFORS 2005. http://www, agifors, org/index.jsp.

共引文献50

同被引文献40

  • 1霍佳震,王新华.基于约束规划求解车辆调度问题[J].物流技术,2005,24(9):110-112. 被引量:4
  • 2ABDELGHANY K F, ABDELGHANY A F, EKOLLU G. An integrated decision support tool for airlines schedule recovery during irregular operations[J]. European Journal of Operational Research, 2008, 185(2): 825-848.
  • 3白风.不正常航班的飞机和机组调度研究[D].南京:南京航空航天大学,2010.
  • 4TEODOROVIC D, GUBERINIC S. on an airline network after a European Journal of Operational Optimal dispatching strategy schedule perturbation[J], Research, 1984, 15(2):178-182.
  • 5TEODOROVIC D, STOJKOVIC G. Model for operational daily airline scheduling[J]. Transportation Planning and Technology, 1990, 14(4): 273-285.
  • 6JARRAH A I Z, YU Gang, KRISHNAMURTHY N, et al. A decision support framework for airline flight cancellations and delays[J]. Transportation Science, 1993, 27(3): 266- 280.
  • 7YAN Shang-yao, YANG D H. A decision support framework for handling schedule perturbation[J]. Transportation Research Part B Methodological, 1996, 30(6): 405 -419.
  • 8ARGUELLO M F, BARD J F, YU Gang. A GRASP for aircraft routing in response to groundings and delays[J].Journal of Combinatorial Optimization, 1997, 1(3): 211-228.
  • 9WEI Guo, YU Gang, SONG M. Optimization model and algo- rithm for crew management during airline irregular operations[J]. Journal of Combinatorial Optimization, 1997, 1(3) : 305-321.
  • 10STOJKOVIC M, SOUMIS F, DESROSIERS J. The opera- tional airline crew scheduling problem[-J]. Transportation Science, 1998, 32(3): 232-245.

引证文献5

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部