摘要
根据变电站综合自动化系统在武汉分公司80万t/a乙烯工程中的应用情况,从分层结构、通信控制、综合监控等方面,介绍变电站综合自动化系统的配置要求,并针对其存在的问题,提出相应的改进措施,以提高变电站运行的可靠性。
This article examines the configuration requirements of integrated automatic system of transformer substation in terms of hierarchical structure, communications control, and comprehensive supervision in consideration of the applications of it in 0.8 milliont/a ethene project in Wuhan branch. In addition, measures for improvement are put forward in light of the existent problems so as to improve its reliability.