期刊文献+

水泥窑处置垃圾焚烧飞灰中试研究 被引量:7

Pilot test of MSWI fly ash treatment with cement kiln
下载PDF
导出
摘要 对垃圾焚烧飞灰处置量为100t/d的中试线的水洗单元、焚烧单元及水洗液处理单元的工艺参数进行了探索。水洗单元的最佳工艺为:水灰比3∶1,1次顺流+2次逆流漂洗的方式。添加飞灰后,窑尾烟气中的污染物排放均有增加,以酸性气体和二恶英类增加最多,但均满足GB4915—2004要求。添加飞灰后烧制的水泥熟料,其标准稠度用水量及氯含量有所升高,而28d强度及凝结时间均有所降低,但差异不显著。钙及重金属是水洗液处理主要的去除对象。经过通CO2、投加Na2CO3、Na2S和FeSO4的处理,基本达到了去除钙及重金属的目的。 A rotary kiln of 100t/d capacity used for MSWI fly ash treatment pilot test was built to explore the process parameters of water washing unit, incineration unit and lavage fluid water treatment. The optimum parameter was that the ratio of liquid to solid should be 3:1 and once concurrent plus twice counterflow washing system. The pollutant in flue gas emission were increased with the addition of fly ash, and the acidic gas and dioxin increased most, but all of them meet the requirements of GB4915-2004. The water requirement of normal consistency and chlorine content of clinker increased when adding fly ash, and the 28d compressive strength, 28d flexural strength and initial setting and final setting time were reduced slightly. Ca and heavy metal was main target to be removed in lavage fluid water treatment. By treating with CO2, Na2CO3, Na2S and FeSO4, Ca and heavy metal could he removed in principle.
作者 李春萍 顾军
出处 《水泥》 CAS 2012年第11期1-3,共3页 Cement
关键词 飞灰 水洗 水泥窑 烟气 水泥熟料 MSWI fly ash water washing cement kiln flue gas clinker
  • 相关文献

参考文献8

  • 1Abad E, Marti nez K, Caixach J,et al. Polychlorinated dibenzo-p- dioxins, dibenzofurans and dioxin-like PCBs in flue gas emissions from municipal waste management plants [J]. Chemosphere, 2006, 63: 570- 580.
  • 2Cline Boudet, Denis Zmimu, blauricette Laffond,et al. Health Risk Assessment of a Modem Municipal Waste Incinerator [J]. Risk Analysis, 1999, 19(6):1215-1222.
  • 3Wiles C C.Municipal solid waste combustion ash:state of the knowledge[J].Joumal of Hazardous Materials, 1996, 47:325-344.
  • 4Guangren Qian, Yu Song, Cangang Zhang,et al. Diopside-based glass- ceramics from blSW fly ash and bottom ash [J]. Waste Management,2006, 26: 1462-1467.
  • 5施惠生.利用城市垃圾焚烧飞灰煅烧水泥熟料初探[J].水泥,2004(11):1-4. 被引量:30
  • 6韩仲琦.日本水泥生态化技术的研究与开发[J].中国水泥,2003(7):27-30. 被引量:10
  • 7Katsuura H, Inoue T, Hiraoka M, et al. Full-scale plant study on fly ash treatment by the acid extraction process[J]. Waste Management, 1996, 16:491-499.
  • 8中川靖博.日本水泥工业与构筑资源循环型社会[C]/,利用水泥回转窑焚烧垃圾技术研讨会论文集.中国水泥协会,2002.10.

二级参考文献7

  • 1曾学敏,狄东仁.吕德斯多夫水泥厂废弃物利用考察报告[J].中国水泥,2002(10):38-43. 被引量:4
  • 2Yuriko Yamamoto. The Forefront of Cement Production and Industrial Waste Utilization Municipal Waste Utilization System, Eco -Cement Obtaining the Japanese Industrial Stundards [J] . Cement & Concrete,Japan. 2002, Aug, No. 666:9-17.
  • 3Hiroshi Uchikawa. Cement and Concrete Industry Orienting Toward Environmental Coad Reduction and Waste Recycling [J]. Journal of Research of the Chichibu Onoda Cement Corporotion. 1997, vol. 48. No.133: 1-33.
  • 4Eiichi Onuma. Rough Estimation of Ecobalance of the Use of Recycled Materials in the Cemenl Industry in Japan as a whole [J]. Journal of Research of the Taiheiyo Cement Corporation. 1999, No. 136: 94-98.[4 ] Hiroshi Hirao. Eco - cement [ J ], Cement & Concrete, Japan. 2002,Apr. No. 662: 50-51.
  • 5GB5085.3-1996.〈危险废物鉴别标准〉[S].[S].,..
  • 6李湘洲.国外生态水泥工业发展的若干动向[J].中国建材,2002(9):35-36. 被引量:2
  • 7蒋明麟.水泥工业处置和利用可燃废弃物技术和政策研究[J].水泥,2002(11):1-10. 被引量:12

共引文献39

同被引文献120

引证文献7

二级引证文献55

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部