摘要
在湿陷性黄土地区开展风电场建设,湿陷性黄土场地上的风力发电机组基础地基经过优化设计,选择适用的地基处理方法,达到工程量较小、投资较少、施工简便、易于保证质量、安全可靠的设计目的。
In collapsible loess area to carry out the construction of wind power,the collapsible loess ground wind turbine foundation optimized design,applied for the selection of foundation treatment method,reach the engineering quantity is smaller,less investment,simple construction,easy to ensure the quality,safety and reliable design objective.
出处
《电力勘测设计》
2012年第5期77-80,共4页
Electric Power Survey & Design
关键词
湿陷性黄土
地基处理
风机基础
桩基础
collapsibility loess
ground treatment
wind turbine foundation
pile foundation.