中国人寿研发中心F-05地块(数据中心)工程同一楼层顶板标高变化多,且大堂部位有跃层柱,整体大钢模无法满足竖向模板施工需求,施工中通过采用速拼小钢模,分段支搭、浇筑跃层柱混凝土的施工方法,节约了成本、降低了劳动强度,对保证工程质量起到了推动作用。
In the China Life Center F-05 Block( Data Center ) Project, there are different roof elevations on the same floor and skip-floor columns are set in the lobby, so large integral steel formwork can not satisfy the construction requirements of vertical formwork. During construction, various construction methods, such as fast-assembly small steel formwork, supporting in segment and pouring of skip-floor column, etc., are adopted to save construction cost, reduce work intensity and promote engineering quality.