期刊文献+

通钢新2号2680m^3高炉设计特点

Designing Characteristic of New No. 2 Blast Furnace with 2 680 m^3 at Shougang Tonggang Steel Company
下载PDF
导出
摘要 通钢2680m^3高炉设计采用全冷却壁、砖壁合一薄壁炉衬、铜冷却壁、炭砖-陶瓷杯复合炉底、全软水密闭循环冷却系统、并罐无料钟炉顶、顶燃式热风炉等一系列先进实用技术,为实现高产、优质、低耗、长寿和环保的生产目标奠定了技术基础。 A series of advanced and operative technologies were adopted in designing of No. 2 blast furnace with 2 680 m^3 in Shougang Tonggang steel company, such as whole cooling stave structure, thin skinned lining, copper cooling stave, carbon brick-ceramic cup complex bottom, closed loop soft water cooling system, paraUel type bell less top and top-combustion hot stove etc. Which established technical foundation for realizing the objects of high yield, high quality, low consuming, long life and environmental friendly production.
作者 谢绍飞
机构地区 首钢通钢炼铁厂
出处 《首钢科技》 2012年第5期1-4,9,共5页 Shougang Science and Technology
关键词 高炉设计 薄壁炉衬 铜冷却壁 无料钟炉顶 顶燃式热风炉 blast furnace design, thin skinned lining, copper cooling stave, bell-less top, topcombustion hot stove
  • 相关文献

参考文献1

二级参考文献1

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部