摘要
A compact facility for cancer therapy has been designed and is presently under construction. A slow beam extraction system using the RF-Knock Out method and 3rd-order resonance is adopted in the synchrotron of this facility. Eight sextupoles are used, four of them are for correcting the chromaticity and the rest for driving the 3rd-order resonance. In order to save the aperture of vacuum chamber, a 3-magnet bump is adopted during the extraction process. The extraction phase space map and the last 3 turns’ particle trajectory before extraction are given. The matching betatron functions with HEBT (high energy beam transport) are also presented.
A compact facility for cancer therapy has been designed and is presently under construction. A slow beam extraction system using the RF-Knock Out method and 3rd-order resonance is adopted in the synchrotron of this facility. Eight sextupoles are used, four of them are for correcting the chromaticity and the rest for driving the 3rd-order resonance. In order to save the aperture of vacuum chamber, a 3-magnet bump is adopted during the extraction process. The extraction phase space map and the last 3 turns’ particle trajectory before extraction are given. The matching betatron functions with HEBT (high energy beam transport) are also presented.
基金
Supported by State Key Development Program of Basic Research of China (2010CB834204)