西气东输二线遂川江顶管穿越施工监测 被引量:4

Monitoring of pipe jacking crossing Suichuan River in the 2nd West-to-East Gas Pipeline
原文传递
导出
摘要 介绍了西气东输二线遂川江顶管施工工艺及原理,结合实际地质状况,选定了最佳的地表沉降监测方案。监控量测数值表明:顶管穿越后地表土体位移的变化与顶管机和监测点之间的距离有关,且接近轴线处监测点的沉降变化明显大于周围测点。在位移产生变化的4个阶段中,第2阶段的位移量最大,而在顶管机通过监测点后,应力松弛引起土压下降,从而导致地面迅速沉降。在顶管施工过程中,上覆土体通常都是先隆起后沉降,逐渐趋于定值。对顶进过程中不同时期引起的沉降量进行计算,计算结果与实测数据相差微小,表明监测数据可以作为评价顶管施工安全状况的依据。 This paper describes the construction technology and principle of pipe jacking in crossing Suichuan River in the 2nd West-to-East Gas Pipeline.The optimal surface settlement monitoring program is selected in accordance with actual geological conditions.Monitoring measurement values indicate that the mass displacement change of surface soil after pipe jacking is related to the distance between pipe pusher and monitoring point,and the monitoring point near the axis is much larger than surrounding monitoring points in the settlement change.In four stages of displacement change,the displacement in the second stage is largest.After the pipe pusher passes through the monitoring point,stress relaxation causes reduction of soil pressure,which results in rapid settlement of the ground.In the pipe jacking construction,overlying soils is first uplifted and then settled to gradually reach a fixed value under normal work condition.Settling volume caused by the jacking in different stages is calculated and the calculation data is in a small difference to measured data,which shows that the monitoring data can be taken as the basis in evaluating pipe jacking construction safety conditions.
出处 《油气储运》 CAS 2012年第11期861-864,887-888,共4页 Oil & Gas Storage and Transportation
关键词 顶管穿越 附加推力 监控量测 隆起量 pipe jacking crossing,additional thrust,monitoring measurement,uplift amount
  • 相关文献

参考文献4

二级参考文献27

  • 1于宁,朱合华.盾构隧道施工地表变形分析与三维有限元模拟[J].岩土力学,2004,25(8):1330-1334. 被引量:147
  • 2王承德.薄覆盖层下顶管防止地面沉降的措施[J].特种结构,1994,11(2):12-14. 被引量:2
  • 3余彬泉 陈传灿.顶管施工技术[M].人民交通出版社,1997..
  • 4DD42-159-2004,基坑工程技术规程.
  • 5邵理中,沈水龙.钢筋砼顶管接头传力衬垫材料的力学特性[J].上海市政工程,1997(1):23-30. 被引量:3
  • 6谢尔勒马.顶管工程[M].北京:中国建筑工业出版社,1983..
  • 7Peck R B. Deep excavations and tunneling in soft ground[A]. In: The 7th International Conference onEngineering[C]. Mexico: [s. n.],Soil Mechanics and Foundation 1969. 225 - 290.
  • 8Sagaseta C. Analysis of undrained soil deformation due to ground loss[J]. Geotechnique, 1987, 37(3): 301 - 320.
  • 9Verruijt A, Booker J R. Surface settlements due to deformation of a tunnel in an elastic half plane[J]. Geotechnique, 1996, 46(4): 753 -756.
  • 10Loganathan N , Poulos H G. Analytical prediction for tunneling-induced ground movement in clays[J]. Journal of Geotechnical and Geoenvironmental Engineering, 1998, 124(9):846 - 856.

共引文献172

同被引文献23

引证文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部