期刊文献+

连续管钻井水力加压器结构设计 被引量:4

Structural Design of the Hydraulic Thruster for Coiled Tubing Drilling
下载PDF
导出
摘要 连续管钻井过程中,底部钻具组合无钻铤,钻压施加困难。为此,设计了一种适用于88.9 mm微小井眼连续管钻井的73 mm三级水力加压器,建立了水力加压器串联在涡轮钻具上方时产生的轴向推力计算模型。为了延长水力加压器的工作寿命,设计了密封性能优良的车氏密封结构;主活塞杆与主缸体之间采用矩形花键连接方式,并进行了矩形花键连接副的接触应力分析。计算与分析结果表明,在钻井液排量5.0~6.0 L/s、密度1.05~1.20 g/cm3条件下可产生50~90 kN的轴向推力,完全满足88.9 mm微小井眼连续管钻井需要。 It is difficult to provide WOB because of no drill ing. Therefore, a kind of Ф73 mm three-stage hydraulic thruster collar on BHA in the process of coiled tubing drillsuitable for the Ф88.9 mm micro-hole coiled tubing drilling was designed. The calculation model for the axial thrust of the thruster series connection which is produced above turbo-drill was established. The Che' s seal structure with excellent sealability was designed in order to lengthen the service life of the thruster. The rectangular spline was adopted as the connection mode between the main piston rod and the cylinder body. The contact stress analysis of the rectangular spline connection pair was conducted. The calculation and analysis show that the axial thrust of 50 - 90 kN will be produced when the drilling fluid displacement is 5.0 -6.0 L/s and the density is 1.05 - 1.20 g/cm3 , which completely satisfies the requirement of Ф88.9 mm micro-hole coiled tubing drilling.
出处 《石油机械》 北大核心 2012年第11期15-18,共4页 China Petroleum Machinery
基金 国家科技重大专项"复杂结构井优化设计与控制关键技术"(2011ZX05009-005)
关键词 连续管钻井 微小井眼 水力加压器 车氏密封 矩形花键 有限元分析 coiled tubing drilling micro-hole hydraulic thruster Che' s seal rectangular spline finite element analysis
  • 相关文献

参考文献10

二级参考文献25

共引文献79

同被引文献61

  • 1邹德永,王瑞和.刀翼式PDC钻头的侧向力平衡设计[J].石油大学学报(自然科学版),2005,29(2):42-44. 被引量:30
  • 2王谊,施连海.水力脉动冲击钻井工具初步研究与试验[J].石油钻探技术,2006,34(2):51-52. 被引量:11
  • 3王延恒,曾传云,张柄顺,刘月军,吕志忠.潜山油藏水平井套管开窗侧钻技术[J].石油钻采工艺,2007,29(5):16-19. 被引量:12
  • 4CUI Chuanzhi, ZHAO Xiaoyan. A study on the develop- ment technology of sidetracking wells in fault block reser- voirs during the high water cut stage [ J ]. Petroleum Sci- ence and Technology, 2013,31 ( 5 ) : 465-471.
  • 5FREHERS S, OGLIANI F, RUTH G, et al. Successful sidetracking of a well onshore Germany by integration of 3D vertical seismic profiling technology--a case study [ J ]. Geophysical Prospecting, 2012, 60 ( 6 ) : 1068- 1081.
  • 6HOGG C, BARKER R, PENANGOS V, et al. Milling low-side casing exit windows in horizontal wells: a case study[ R]. SPE 150347-MS, 2012.
  • 7PONTON C B, ROBERTS J M, FIPKE S R, et al. Are you on the right track with casing milling? innovative pre-cision-milled windows offer improved casing exit reliability for sidetracking and multilateral completions [ R ]. SPE 127764-MS, 2010.
  • 8ANYANWU O N, KLOTZ C, LABRECQUE D, et al. Optimized downhole mud motor delivers outstanding per- formance improvement in alaska coiled tubing drilling [R]. SPE 153474-MS, 2012.
  • 9DEWEY C H, CHILDERS R D. Planning for successful window milling operation[ R]. SPE 49255-MS, 1998.
  • 10HEARN D D, BLOUNT C G, KAMLOWSKY P E. Coiled tubing window milling[ R]. SPE 35126-MS, 1996.

引证文献4

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部