期刊文献+

工程项目管理多目标均衡优化研究综述 被引量:2

A review of the multiobjective tradeoff research of construction projects based on intelligent optimization algorithm
下载PDF
导出
摘要 寻求工程项目各目标之间的均衡最优是工程项目管理的重要方面,近年来相关研究发展迅速,已取得了较为丰硕的研究成果。本文通过文献研究,对该领域的研究现状进行了综述。分别从确定条件下的工程项目多目标均衡优化模型和不确定条件下的工程项目多目标均衡优化模型两个方面,对该领域的研究现状进行了分析,并展望了该领域的研究趋势和发展方向。旨在总结当前工程项目多目标均衡优化领域中的研究成果并揭示当前的热点研究问题,为今后研究提供一定的参考和建议。 The optimal equilibrium between the multiple objectives of construction projects is a significant aspect of project management research,which has seen rapid development in recent years,gaining a bunch of fruitful achievements.In this paper,a review is provided for the multiobjective tradeoff research of construction projects based on literature review.Models under deterministic conditions and nondeterministic conditions are investigated and summarized.Some suggestions on the possible direction for future research are included considering the algorithms adopted in the problem solution.This paper aims at providing a review of the achievements in this area so far and keeping track of the ongoing research topics so as to give certain indications for research that follows.
出处 《中国工程科学》 北大核心 2012年第11期107-112,共6页 Strategic Study of CAE
基金 国家自然科学基金资助项目(70871088 71272146)
关键词 工程项目 项目管理 多目标均衡优化 智能优化算法 construction project project management multi-objective optimization intelligent optimization algorithm
  • 相关文献

参考文献32

  • 1Kelley J E. The criticalpath method: Resources planning and scheduling [ J ]. Industrial Scheduling, 1963 : 347 - 365.
  • 2Feng C W. Using genetic algorithms to solve construction timecost tradeoff problems [ J]. Journal of Computing in Civil Engineering, 1997, 11: 184-189.
  • 3Babu A J G, Suresh N. Project management with time, cost, and quality considerations [ J ]. Journal of Operational Research, 1996, 88 : 320 - 327.
  • 4Brucker P, Drexl A, Mohring R, et al pro- ject scheduling: Notation, classification, models, and methods [ J ]. European Journal of Operational Research, 1999, 112 ( 1 ) : 3 -41.
  • 5李红仙,宣卫红,谈飞,张云宁.基于激励遗传算法的动态时间/费用优化[J].系统工程学报,2007,22(3):333-336. 被引量:10
  • 6Li H, Love P. Using improved genetic algorithms to facilitate time- cost optimization [ J ]. Journal of Construction Engineering and management, 1997, 123 : 233 -237.
  • 7Li H, Cao J N, Love P. Using machine learning and GA to solve timecost tradeoff problems [ J]. Journal of Construction Engineer- ing and Management, 1999, 125:347-353.
  • 8Zheng D X M, Ng S T, Kumaraswamy M M. Applying Pareto ranking and niche formation to genetic algorithmbased multiobjec- tive timecost optimization [J]. Journal of Construction Engineering and Management, 2005, 131(1) : 81 -91.
  • 9Xiong Y, Kuang Y. Applying an ant colony optimization algorith- mbased muhiobjective approach for time-cost tradeoff [ J ]. Journal of Construction Engineering and Management, 2008, 134 ( 2 ) : 153 - 156.
  • 10Yang I. Using elitist particle swarm optimization to facilitate bic- riterion timeeost tradeoff analysis. [ J ]. Journal of Construction Engineering and Management, 2007, 133(7) : 498 -505.

二级参考文献15

  • 1Russell A.A comparison of heuristics for scheduling project with cash flows and resource restrictions[J].Management Science,1986,32(10):1291-1300
  • 2Hegazy T,Ersahin T.Simplified spreadsheet solution.II:Overall schedule optimization[J].Journal of Construction Engineering and Management,2000,127(6):469-475.
  • 3Russell A.Cash flows in networks[J].Management Science,1970,16(5):357-373
  • 4Li H,Cao J N.Using machine learning and GA to solve time-cost trade-off problem[J].Journal of Construction Engineering and Management,1999,125(5):347-353.
  • 5Leu S S,Yang C H.GA-based multicriteria optimal model for construction scheduling[J].Journal of Construction Engineering and Management,1999,125(6):420-426.
  • 6[日]玄光男,[日]程润伟著,于歆杰,周根贵.遗传算法与工程优化[M]清华大学出版社,2004.
  • 7Feng C W,,Liu L,Burns S A.Stochastic construction time-cost trade-off analysis. Journal of Computing in Civil Engineering . 2000
  • 8Khaled,E l Rayes.Time-Cost-Quality Trade-Off Analysis for Highway Construction Costs. Journal of Construction Research . 2005
  • 9Do Ba Khang,Yin Mon Myint.Time, cost and quality trade-off in project management: a case study. International Journal of Project Management . 1999
  • 10Goldberg D E.Genetic Algorithms in Search, Optimization, and Machine Learning. . 1989

共引文献22

同被引文献13

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部