摘要 枕头坝水电站抗滑桩为大孔径矩形人工挖孔桩,在深覆盖层抗滑桩护壁施工过程中,采用干净河砂充当护壁混凝土底模(无底模)施工,可大幅度提高抗滑桩护壁及成孔速度,降低深覆盖层中抗滑桩施工的塌孔现象,具有操作简单、安全可靠、经济适用等特点。 The anti-slide pile of Zhentouba Hydropower Station is rectangular-shaped hand-dug piles with large diame- ter. During the construction of anti-slide pile protecting wall in deep overburden, the construction of anti-slide pile pro- tecting wall and hole forming can be sped up by using clean river sand as bottom framework (bottomless) and the risk of hole collapse can be reduced. The construction technology has the characteristics of simple operation, safety, reliability, economical and practical performance.
作者 吴平安
出处 《水电与新能源》 2012年第6期16-18,共3页 Hydropower and New Energy
关键词 抗滑桩 护壁 无底模施工 anti-slide pile wall protection bottomless framework construction
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部