脚基坪水电站发电机转子测圆架旋转中心体的设计、安装和调整 被引量:2

Design,Installation and Adjustment of the Generator Rotor Circular Measuring Frame Rotating Central Body of Jiaojiping Hydropower Station
下载PDF
导出
摘要 以脚基坪水电站水轮发电机组为例,就发电机转子测圆架旋转中心体的设计、安装和调整进行了较为详尽的阐述和计算。计算和验证结果表明:该方法是合理、有效的,而且可操作性强,具有较高的推广应用价值。 By taking Jiaojiping Hydropower Station hydroturbine generator set as an example, the design, installation and adjustment of the generator rotor circular measuring frame rotating central body are described and calculated in de- tail. The results indicate that the method is reasonable, efficient and operational and has great development and applica- tion value.
出处 《水电与新能源》 2012年第6期46-48,共3页 Hydropower and New Energy
关键词 转子测圆架 旋转中心体 设计 安装 调整 脚基坪水电站 rotor circular measuring frame rotating central body design installation adjustment Jiaojiping Hydro-power Station
  • 相关文献

参考文献2

  • 1黄劲枝.机械设计基础[M].北京:机械工业出版社,2001.
  • 2GB/T8564-2003.水轮发电机组安装技术规范[S].[S].,..

共引文献41

同被引文献7

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部