期刊文献+

水电工程建设征地农村移民安置系统研究 被引量:2

Research on Rural Resettlement System of Land Requisition in Hydropower Engineering Construction
下载PDF
导出
摘要 水电工程建设征地农村移民安置涉及人口、资源、环境、生态、经济等多个方面,整个过程就是移民安置区的乡村重构过程。通过对水电工程建设征地农村移民安置进行系统分析,构建了移民安置管理体系,从纵向和横向两个方面分析了移民安置管理体系的内容,并结合瀑布沟水电站建设征地农村移民安置工作实践,对移民安置管理体系进行了有益的探讨。 The rural resettlement of land requisition in hydropower engineering construction must consider a number of factors, such as population, resources, environment, ecology and economy, so the whole resettlement is a process of rural reconstruction in resettled area. Through the systematic analysis on rural resettlement of land requisition in hydropower engineering construction, the management system of resettlement is established and its contents are analyzed from lateral and longitudinal aspects respectively. The management system of resettlement in Pubugou Hydropower Station is studied herein as a case study.
出处 《水力发电》 北大核心 2012年第12期1-4,共4页 Water Power
关键词 水电工程 移民安置 管理体系 系统分析 环境容量 瀑布沟水电站 hydropower engineering resettlement management system system analysis environment capacity PubugouHydropower Station
  • 相关文献

参考文献5

二级参考文献38

共引文献58

同被引文献14

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部