7[1]Homaifar, A. , Lai, S. , and Qi, X. Constrained optimization via genetic algorithms [ J ]. Simulation, 1994,62 (4) :242 - 254.
8[3]Tarek Hegazy. Optimization of resource allocation and leveling using genetic algorithms[ J]. Journal of Construction Engineering and Management, 1999, (6): 167 - 175.
9[4]Weng - Tat Chan, David K. H. Chua, Govindan Kannan. Construction resource scheduling with genetic algorithms[ J]. Journal of Construction Engineering and Management, 1996, ( 6 ): 125 - 131.
10[5]Cheng, R. and M. Gen. Evolution program for resource constrained project scheduling problem[ P]. 736 - 741.