摘要
对复地东山国际一期项目的地基处理设计进行了探讨,结合该项目实际情况,提出以"换、堵、疏"为基本思路,并分别作了具体阐述,为后续工程施工提供了科学借鉴和安全保障。
The paper explores the basement treatment design for the first phase of Fudidongshan international project, combining with the actual situation of this project, points out the basic idea for "replacement, pluggin and soothing" and undertakes the factual illustration, so as to pro- vide some scientific reference and safety guarantee for following projects.
出处
《山西建筑》
2012年第35期59-60,共2页
Shanxi Architecture
关键词
湿陷性黄土地基
处理方法
换土
隔水层
collapsible loess foundation, treatment method, soil replacement, water-resisting layer