摘要
以北京金融街A5地块写字楼的冰蓄冷空调系统工程为例,根据冰蓄冷技术的特点,配置主机和蓄冰设备,给出了冰蓄冷系统的负荷平衡策略,并对其运行费用进行合理测算,表明冰蓄冷系统的装机容量是常规空调系统的65%,运行费用是常规空调制冷系统的53%。
Taking the ice storage air-conditioner system at A5 Block Office Building along Jinrong Street in Beijing as the example, the paper provides the loading balance strategies for the ice storage air-conditioner system, according to the features of the ice storage technology, the allo- cation main machine and ice storage equipment, undertakes the reasonable measurement for its operation cost, and proves the installation capaci- ty of the ice storage system is 65% of the regular air-conditioner system and its operation cost takes up 53% of the regulation air-conditioner cooling system.
出处
《山西建筑》
2012年第35期154-156,共3页
Shanxi Architecture
关键词
冰蓄冷系统
装机容量
运行费用
ice storage system, installation capacity, operation cost