摘要
分析了当前风力发电变电站二次设备选型和安装中存在的问题,结合质量管理的相关理论,提出了解决对策,以期有效地提高电力系统经济性以及变电站安全稳定运行能力。
The paper analyzes the problems in the secondary type selection for current wind power generation substation, and explores the solu- tion strategies by combining with the relative theories of the quality management, so as to enhance the economy of the power system and the safe and stable operation capacity for the substation.
出处
《山西建筑》
2012年第35期156-157,267,共3页
Shanxi Architecture
关键词
风力发电
变电站
二次设备选型
对策分析
wind power generation, substation, secondary equipment type selection, strategic analysis