摘要
本文介绍了两幢六层砌体住宅房屋纠偏工程的设计、施工过程。在这些工程中 ,综合运用了锚杆静压桩、钻孔掏土、压密注浆等方法 。
The design and construction process of de inclination of two six story masonry buildings is presented in this paper. The techniques of pressing in R.C. pile with anchor rods, drilling and drawing out soil, and pressing in grout ect. are used in this de inclination project, and good result is obtained..
出处
《结构工程师》
2000年第2期26-31,共6页
Structural Engineers