220MW机组低压加热器疏水不畅分析及改造 被引量:6

Analysis and Modification of Drain in Block for LP Heater in 220MW Units
原文传递
导出
摘要 针对越南某电厂220 MW机组在启动调试阶段3号低压加热器疏水不畅的问题进行分析。在所采集实时运行数据的基础上,结合原设计参数及现场情况,通过对2、3号低压加热器疏水系统进行改造及对冷渣器冷却水量进行调整,消除了3号低压加热器疏水不畅问题。就冷渣器冷却水回水温度对3号低压加热器疏水的影响提出了解决办法。 This paper analyzed the reason of drain in block in No. 3 low pressure (LP) heater in 220 MW units during the startup and debugging stage. Based on the real-time data, the original design parameters and the site situation, the drainage systems in No. 2, No. 3 LP heaters were modified, and the cooling water of slag cooler was adjusted, in order to solve the drain in block in No. 3 LP heater. Finally, this paper suggested the solution for the influence of cooling water's backwater temperature in slag cooler on the No. 3 LP heater's drain.
出处 《电力建设》 2012年第11期46-48,共3页 Electric Power Construction
关键词 火电厂 低压加热器 疏水 改造 thermal power plant low pressure heater drain modification
  • 相关文献

参考文献7

二级参考文献4

  • 1王占奎.交流变频调速技术应用例集[M].北京:科学出版社,1995..
  • 2许振茂.变频调速器使用手册[M].北京:兵器工业出版社,1992..
  • 3王春昌.《燃煤锅炉热一次风加热器及其系统》专利申报说明书[R].陕西:西安热工研究院有限公司,2009.
  • 4长沙电力学院等合编.热力发电厂[M].北京:中国电力出版社,1997.

共引文献30

同被引文献48

引证文献6

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部