摘要
介绍HI 1 3串列加速器AMS离子交替注入系统的结构及主要部件的设计 ,给出了部分测量结果。
The accelerator mass spectroscopy (AMS) facility based on the HI 13 tandem accelerator has been operated manually since it's beginning. To increase the accuracy and efficiency of the isotope ratio measurement, an automatic cycling system for the AMS facility has been developed. With this system stable isotope and its radioisotope are automatically and alternatively injected into the tandem. Some measurement results with this system are presented.
出处
《原子能科学技术》
EI
CAS
CSCD
北大核心
2000年第4期296-301,共6页
Atomic Energy Science and Technology
关键词
串列加速器
AMS
间隙透镜
交替注入系统
结构
tandem accelerator
accelerator mass spectroscopy (AMS)
alternative injection
gap lens