针对新近填土(特别在较厚的填土)地基上进行轻型工业厂房建设面临的问题,经实践指出采用碎石桩强夯组合进行地基处理既科学又经济,并能有效缩短施工工期。
Aimed at problems faced with light industrial plant construction on new earth filling foundation(especially on thicker filling),the practice pointed out that it is both science and economy to adopt gravel pile dynamic compaction Combination for ground treatment so that can effectively shorten the construction period.